Endurance Icon

Gigawatts of Renewable Firm Power

Behind the Meter

Washington • California • Japan • Southeast Asia


Data Center
Power Bottleneck

"I think we would probably build out bigger clusters than we currently can if we could get the energy to do it"

- Mark Zuckerberg

"[Policymakers should] make sure that no American companies need to build data centers outside of America for energy reasons"

- Jensen Huang

"There's no way to get there without a breakthrough"

- Sam Altman

"The stakes are high and the race goes on. Soon Oracle will begin construction of data centers that are more than a gigawatt"

- Larry Ellison

The US power grid does not have the capacity, speed, or reliability to support hyperscale data centers

Power Sector Charts


Our Solution

Endurance Energy is building offshore geothermal generators to eliminate the power bottleneck for the next generation of hyperscale data centers. By harnessing the vast potential of offshore hydrothermal reservoirs, Endurance will provide gigawatts of behind the meter firm power while colocated to major population centers, including the world's largest cloud service providers.

Southeast Asian Ring of Fire Population Map

The technical capabilities required to access offshore hydrothermal resources are well developed, allowing Endurance to focus engineering efforts on cost reduction across all verticals.

Surveying
Drilling
Reservoir Management
Fluid Transmission
Power Generation
Power Transmission
Power Conditioning


Meet the Team

The Endurance founding team is made up of former Starship engineers who specialize in executing large-scale deep tech projects at low cost and high speed.

Andrew Redd

Andrew Redd

Hometown: Seattle, WA

Previous Experience: SpaceX, Neuralink

First Round Capital Logo

First Round Capital

Lead Investor